BREAKDOWN ESTIMATE OF MATERIALS FOR TRANSFERABLE LEARNING BUILDING

Oty.Unit

Description

Unit Cost

Amount

25 pcs. a.) walling /Post/Outside Bench
1  pcs 2"x:"2x8' for bench 45 1125
  2   pcs 2"x10"5 for bench 220 220
  2 pcs 2'x10"x5 for bench 140 280
  8 pcs 2"x2x6' for hol walling 32 256
  4 pcs Bamboo Trunk 100 400
  3kls CW Nails #3/#2 1/2  80 240
 1kls CW Nails #1/#1 1/2 100 100
 4pcs Ga.#31 Plain Sheets 400 1600
 3pcs Bamboo Blinds (ready made) 200 600
Sub-total 4821
b.)Windows/Door
8 pcs. 1"x2"x10'-Wind Frame 85 680
20 pcs. 1"X2"X8' Wnd/Door frame 75 1500
4pcs 1/4"x4x8' Marine Plywood 475 1900
2 pcs. 1/4"x4'x6 Marine Plywood 380 760
50 pcs. Bolt & Nut w/washer 40 2000
15 pcs. Barrel Bolt for window @ 2"long 15 225
11 pairs Hinges 1'x3" for Door 30 330
6 pc. Safety Hasp 15 90
20 pcs. Hook  & Eye @ 8-10 " long 20 400
1 pcs. Barrel Bolt for Door @3" long 15 15
sub-total 7900
c.Truss /Roofing
4 pcs.  2"x2"x7' rafters 40 160
4 pcs. 2"x2"x10 purlins 56 224
4 shts. 32"x8' Ga.# 26 Corrugated G.I Sheets 600 2400
1kl. G.I Roofing Nails 120 120
sub-total 2904
Total 15625
30% 4687.50

                                                                                        Total                      20312.50